Skip to main content
The new name for DisabledGo

1.07 Meeting Room

13-15 South College Street, The University of Edinburgh, Central Area, Edinburgh, EH8 9AA

View Accessibility Symbols

Accessibility Symbols

For more information about what these symbols mean, view our Accessibility Symbols Guide.

Close this popup window.

Access Guide

Show Easy Read

Access To

  • 1.07 Meeting Room is located on the first floor of 13-15 South College Street, on the rear left of the building, inside of the Business School Postgraduate Research Hub.
  • Keycard access is required to access the corridor of the Business School Postgraduate Research Hub that this room is located on.
  • View information on South College Street, 13-15 (opens new tab).
  • View information on Business School Postgraduate Research Hub (opens new tab).
  • The most accessible route has step-free level access and manual doors.
  • There is written text and numbered signage on or near the entrance.
  • There is step-free level access into 1.07 Meeting Room.
  • There is a single manual door which opens away from you.
  • The width of the opening is 77cm.
  • The door has a high visual contrast.
  • There is a small lip at the threshold of the door.

Meeting Room

  • This is a meeting room.
  • There is step-free level access throughout the room.
  • There is room for a wheelchair user to manoeuvre (150cm x 150cm).
  • There is not a hearing assistance system.
  • Floor coverings are even with no trip hazards.
  • The walls and floor have a high visual contrast.
  • Lighting levels were even at the time of the survey.
  • There are no designated spaces for wheelchair users.
  • There is space for an assistance dog to rest.
  • Seating available in the room includes: chairs with armrests.
  • Furniture available in the room includes: tables.
  • The tables are fixed.
  • The surface heights are suitable for wheelchair users.
  • The clear underside space of the surfaces is suitable for wheelchair users.
  • This room has a television screen.
  • The television screen was not installed at the time of survey (January 2026).